Document toolboxDocument toolbox

Ensure operators acknowledge in-process engineering changes 

An engineering change notice is used to change in-progress products and processes. Change notices are an easy way to make shop floor operators aware of temporary changes in a production flow. With change notices in FactoryLogix, you can react quickly to temporary changes such as a shortage of one material that requires substituting a different material. 

Engineering Change Notices (ECN)

Sometimes things don't go as planned and changes must be broadcast to the factory floor for an already-released product. This course details the steps necessary to initiate an Engineering Change Notice to communicate these types of modifications in real time. Operators on the factory floor can be required to acknowledge these change notices to ensure compliance. 

Related documentation

 

Copyright © 2024 Aegis Industrial Software Corporation. All Rights Reserved.