Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Version published after converting to the new editor

The Require Validation at Synchronized Operations global option (NPI>System Configuration>Production Portal>Option Type: Synchronized Operations>Require Validation at Synchronized Operations) allows you to specify whether synchronized operations (primary work) must be confirmed by shop floor operators in Production—either by scanning the barcode of a serialized item or by checking a non-serialized quantity—before they can move on tosecondary work. The default setting for this option is False (no validation required).

...