  1. Log into the Production client application.

  2. On the Production toolbar, select the Batch Selector button (next to the Home button) to display the Current Batch List window where you can initialize barcodes into a batch.

Production toolbarImage Removed

  1. Production toolbarImage Added

Current Batch List windowImage Removed

  1. Current Batch List windowImage Added


  2. Select

the Add buttonImage Removed button
  1. the Add Add buttoImage Added button at the top of the Current Batch List window to display the Add Batch dialog.

  2. Enter details for the new batch, then select OK.

Noteicontitle
false

Note

:

Select the Show Out-of-Route Operations

 Show Out-of-Route OperationsImage Removed button

Show Out-of-Route Operations buttonImage Added button in the upper-right corner of the Current Batch List window to access out-of-route operations for the current process flow.

Add Batch dialogImage Removed


Add Batch dialogImage Added



The following table describes the information you specify when you add a new batch using the Add Batch dialog.

Item

Description

Batch Name

Specifies the name of the batch/job/work order.

Order

Specifies an order name/number that associates one or more batches to a purchase order for tracking purposes.

Description

(Optional) Specifies a detailed description for the batch.

Activation Date

Indicates the date when a pending batch will be active and available in production.

Lot

(Optional) Specifies the lot number or ID to which the batch belongs.

Fulfillment Date

Indicates the expected or anticipated date that the completed product(s) will ship.

Approval

Optionally specifies the approval process applied to this Batch before production can begin. (See Approvals and sign-off for more information.)

  • No Approval Process - Default setting.

  • Production Launch Batch Approval - A batch must be approved before production can begin.

Quantity Enforcement

There are four options to help you enforce the build quantity:

  • Continuous Build - For long-running assemblies. You can keep building product until you close the batch.

  • No Quantity Verification - There is no predetermined quantity to be built.

  • Enforce Verification (Warning) - Warns you if you attempt to exceed the defined build quantity, but still allows units to be built beyond the prescribed quantity.

  • Enforce Verification (Error) - Does not allow too many assemblies to be built.

Quantity

Specifies the number of units to be manufactured with this batch.

Responsible Users

Specifies one or more people responsible for a production batch.

Select the ellipsis (...) to display the Select User/User Group dialog where you can select one or more users or user groups.

Image Removed


Select User User group dialogImage Added

Contract Number

Specifies the contract under which a production batch is being produced (if one exists).

Location

Specifies the physical location where a batch will be produced. No Site Location is the default.

Panel Barcode Template

Specifies the barcode template/mask to be used for the panel (only for panelized assemblies). No Template is the default.

Panel Printed Label

Specifies the printed label template to use when generating a panel barcode label. No Print Label is the default.

Unit Barcode Template

Specifies the designated barcode template/mask for each unit (or circuit in a panel).

Unit Printed Label

Specifies the printed label template to use when a printed label is generated for an individual unit or circuit in a panel. No Print Label is the default.

Starting/Ending Serial

Optionally lets you define a range of serial numbers that will be valid for this batch.

Process

Select the Select Process

Select Process buttonImage Removed button

Select Process buttonImage Added button on the right side of the dialog to display options to help you select the process revision and assembly to be built in this batch. You can search by assembly and/or by customer. 

Select Process optionsImage Removed


Select Process optionsImage Added
Hard Hat view of the operation listImage Removed


Hard Hat view of the operation listImage Added

  1. In some cases, you need to select both an operation and a physical location. For example, when Material Setup is required, FactoryLogix needs to know which workstation the materials are being loaded on.

  2. Select the small icon (the gears) in the upper-right corner of a batch to display the Batch Product Initialization dialog where you initialize a product into a batch.

Hard Hat view of an operation list and a location listImage Removed
  1. Hard Hat view of an operation list and a location listImage Added