Use the following procedure to create a kit group.
Log into
...
the NPI
...
client application.
Select
...
Logistics > Kit Group Setup.
Select Add
...
, enter
...
a Name
...
for the kit group, then
...
select OK.
...
(Optional) In the Kit Groups window, enter a description for the new kit group in
...
the Description
...
field.
Note
...
To delete a kit group, select the kit group name on the left side of the window, select the Delete
...
button, then select
...
Yes
...
to delete the kit group
...
or
...
No
...
to return to the window.
Select one or more resource types for the kit group from
...
the Resource Type(s) drop-down by selecting each check box that corresponds to a resource type for this kit group.
...
Note
A single resource type may only be assigned
...
to one
...
kit group. (See
...
...
for more information about resource types.)
Use the Kit Group Type drop-down to specify this kit group
...
as Scheduled or Unscheduled (see the following table for details).
Kit group type | Description |
---|---|
Scheduled | When used together with FactoryLogix Production Scheduling, |
...
Production Planners can place a scheduled kit group into the production schedule of specific factory resources (production lines, workstations, areas, and so on) on a batch-by-batch basis. Transportation orders are generated to inform the stock room exactly when the materials in this kit group need to be prepared. A destination (factory resource) on the factory floor is specified where materials will be delivered. | |
Not Scheduled | The kit group |
...
will not |
...
be scheduled in the Production Scheduling area. A kit will be created in the stock room and dispatched to the factory floor under the kit group name, but there |
...
will not |
...
be a specific destination (factory resource) or a time frame. Stock room workers will create and process this kit using FactoryLogix, but on a timeline that is established using their own internal processes. |
...
Make selections in
...
the Kit Groups
...
window based on your needs using the options described in the following table.
Option | Description |
---|---|
Reservation UID Strategy |
|
...
|
...
icon | false |
---|
...
A completed batch |
...
is a batch that has satisfied its quantity requirements. |
...
A closed batch |
...
is typically done by the user. The batch may not have met its quantity, but the user wanted it closed. | |
Material Dispatch Strategy |
|
...
|
...
|
...
|
...
| |
Reordering Strategy |
|
...
|
...
|
...
|
...
|
...
|
...
|
...
|
...
| |
Material Staging Strategy |
|
...
|
...
|
...
|
...
|
When you are finished setting up the kit groups,
...
select Save
...
in the lower-right corner of the window to save the kit group.
Info |
---|
...
Important |
...
Once a kit group is in use in the Production client application, you |
...
cannot |
...
modify it. |