Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. In the Please select a V7 Assembly to Import dialog, enter a partial or full assembly name in the Search for box.

  2. Use the Search By buttons to search the Fusion database for processes by Assembly name, Assembly Revision, Process Revision, and Customer name, then select the Search Search buttonImage Removed Binoculars_icon.pngImage Added button (the binoculars).

  3. Select the Import BOM button to import any BOM information associated with the selected assembly, assembly revision or process revision, including BOM Level AML and Alternate Part information.

  4. Select the Import CAD button to import any CAD or Gerber data associated with the selected assembly, assembly revision, or process revision.

...

Note

Import CPF - In addition to the CAD and BOM files, imports process routing, visual aids, and other process ifnormation contained within a single *.CPF file. This tool is described in the topic Import product and process data from A V7 CPF file.

  1. Select the Search Search buttonImage Removed button  button Binoculars_icon.pngImage Added (the binoculars) to search for the V7 data.

  2. If the assembly name and revision already exist in the FactoryLogix database, a prompt will display, asking how you want to handle the BOM and CAD data:

    Assembly already exists messageImage Modified


    • Link to the Assembly in FactoryLogix - Utilizes the existing assembly's CAD and BOM data. (This option disables the Import CAD and Import BOM buttons on the toolbar.)

    • Re-import from the Legacy System - Overwrites existing assembly CAD and BOM data with the selected V7 assembly data.

    • Create a New Assembly Revision - Allows a new assembly revision to be created under the existing assembly name.

  3. On the New Assembly page, the selected V7 assembly name should appear in the Assembly Information area. Select Next.

  4. On the New Process Options page, select an existing FactoryLogix process template using the Choose a Template drop-down.

    New Process OptionsImage Modified


The Process Mapping area of the page allows you to map the V7 process revision model points to FactoryLogix process flow operations.

...

  1. Map the V7 model points to the appropriate FactoryLogix operations, then select Finish to begin importing the V7 project into FactoryLogix.


    Status messages alert you to the progress of the import.

    Importing V7 messageImage Modified



    When the import is complete, FactoryLogix will open the newly-created process in the Process Definition window. The CAD and BOM are imported and the Process Flow node of the Process Tree is selected. Any V7 import errors or information are displayed at the bottom of the Process Tree in the Visual Aid Import Log. 

...


  1. Visual aid import logImage Added


  2. Select the Visual Aid Import Log link to view any import errors.

...


  1. Visual aid import log detailImage Added



    Any errors will display in the Error List along with an explanation, model point, and the page number of the encountered error.

  2. To export the full import log as a *.csv file, select the Export CSV File button

...

When you're finished viewing the import log, select OK to return to the Process Definition window.

...

Any errors will display in the Error List along with an explanation, model point, and the page number of the encountered error.

...

  1. in the upper-right corner of the window.

  2. When you're finished viewing the import log, select OK to return to the Process Definition window.