Log into the NPI client application.
Select Logistics > Kit Group Setup.
Select Add
, enter a Name for the kit group, then select OK.(Optional) In the Kit Groups window, enter a description for the new kit group in the Description field.
...
Select one or more resource types for the kit group from the Resource Type(s) drop-down by selecting each check box that corresponds to a resource type for this kit group.
Note
A single resource type may only be assigned to one kit group. (See Set up stock locations for more information about resource types.)
...
Use the Kit Group Type drop-down to specify this kit group as Scheduled or Unscheduled (see the following table for details).
Kit group type | Description |
---|---|
Scheduled | When used together with FactoryLogix Production Scheduling, Production Planners can place a scheduled kit group into the production schedule of specific factory resources (production lines, workstations, areas, and so on) on a batch-by-batch basis. Transport orders are generated to inform the stock room exactly when the materials in this kit group need to be prepared. A destination (factory resource) on the factory floor is specified where materials will be delivered. |
Not Scheduled | The kit group will not be scheduled in the Production Scheduling area. A kit will be created in the stock room and dispatched to the factory floor under the kit group name, but there will not be a specific destination (factory resource) or a time frame. Stock room workers will create and process this kit using FactoryLogix, but on a timeline that is established using their own internal processes. |
...
...
Make selections in the Kit Groups window based on your needs using the options described in the following table.
Option | Description |
---|---|
Reservation UID Strategy |
A completed batch is a batch that has satisfied its quantity requirements. A closed batch is typically done by the user. The batch may not have met its quantity, but the user wanted it closed. |
Material Dispatch Strategy |
|
Reordering Strategy |
|
Material Staging Strategy |
|
When you are finished setting up the kit groups, select Save in the lower-right corner of the window to save the kit group.
...