Material reservations
Introduction
The Production Planning environment in FactoryLogix NPI makes use of a reservation system to “lock” specific material instances (UIDs) to specific batches. These reservations ensure that the materials required to build something are on hand when production begins on the factory floor. By default, required materials are reserved using First In First Out (FIFO) rules so that the oldest materials are consumed first.
Copyright © 2024 Aegis Industrial Software Corporation. All Rights Reserved.