Use the following procedure to create a kit group.
Log into theNPIclient application.
Select Logistics>Kit Group Setup.
Select Add , enter aNamefor the kit group, then selectOK.
(Optional) In the Kit Groups window, enter a description for the new kit group in theDescriptionfield.
Note:
To delete a kit group, select the kit group name on the left side of the window, select the Deletebutton, then selectYesto delete the kit grouporNoto return to the window.
Select one or more resource types for the kit group from theResource Type(s) drop-down by selecting each check box that corresponds to a resource type for this kit group.
Note:
A single resource type may only be assigned toonekit group. (See German Lagerorte einrichtenfor more information about resource types.)
Use the Kit Group Type drop-down to specify this kit group asScheduledorUnscheduled (see the following table for details).
Kit group type
Description
Scheduled
When used together with FactoryLogix Production Scheduling,Production Planners can place a scheduled kit group into the production schedule of specific factory resources (production lines, workstations, areas, and so on) on a batch-by-batch basis.
Transportation orders are generated to inform the stock room exactly when the materials in this kit group need to be prepared. A destination (factory resource) on the factory floor is specified where materials will be delivered.
Not Scheduled
The kit group willnotbe scheduled in the Production Scheduling area. A kit will be created in the stock room and dispatched to the factory floor under the kit group name, but there willnotbe a specific destination (factory resource) or a time frame.
Stock room workers will create and process this kit using FactoryLogix, but on a timeline that is established using their own internal processes.
Make selections in theKit Groupswindow based on your needs using the options described in the following table.
Option
Description
Reservation UID Strategy
Reserve a unique set of materials for each individual Batch Reserves only the kitted materials required to complete the batch.
Dynamically share materials across multiple Batches running on the same production line Allocates kitted materials as needed for all batches on the same production line.
Number of previous Batches to check for Excess Materials Specifies a "look back" throughn completed batches. When excess kitted materials are located, they are allocated dynamically to upcoming batches on the same production line to help maintain peak efficiency.
Acompleted batchis a batch that has satisfied its quantity requirements. Aclosed batchis typically done by the user. The batch may not have met its quantity, but the user wanted it closed.
Material Dispatch Strategy
Issue Entire Materials in Initial Transport Issues all materials necessary to build the entire batch.
Limit Number of Kitted Reels to Limits the number of kitted reels to the number you specify.
Limit Initial Amount of Kitted Materials to (Hours: Minutes) Limits the initial amount of kitted materials to the specifiedHoursandMinutesbefore additional kitted materials are released from stock.
Reordering Strategy
Use Manual Reordering Specifies only manual reordering for kitted materials/kit groups. Operators must manually re-order materials as needed.
Use Automatic Reordering Material requests from stock are generated automatically based on consumption rates in production.
Reorder Interval: Every (Hours: Minutes) Specifies the reorder interval for kit groups everynHoursandnMinutes.
Reorder Priority Sets the priority of the reorder transportation orders when requesting new materials (High,Medium, orLow).
Material Staging Strategy
Transport Material Directly to Factory Resources Ensures that kitted materials are transported directly to the factory resources requiring them.
Filtered Source: Specifies the factory stock location where kit groups are transported from.
Transport Material to Staging Location (Source: Target) Ensures that kitted materials are transported to the specified staging location.Sourcespecifies where the materials originate in the factory;Targetspecifies the delivery location in the factory where they will be staged.
When you are finished setting up the kit groups, selectSavein the lower-right corner of the window to save the kit group.
Important!
Once a kit group is in use in the Production client application, youcannotmodify it.