FactoryLogix Learning

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

The following illustration provides a high-level view of the FactoryLogix Administrative Quality Management (AQM) workflow that provides both FRACAS and CAPA capabilities.


High-level AQM workflow


A non-conformance can be initiated from a variety of sources, for example:

  • A problem at an inspection station whether it is a human, a machine, or a piece of test equipment generating an error or failure
  • A problem during manufacturing that generated a non-conformance when a customer opened an incident after a product was shipped
  • A problem or failure reported by a field service technician
  • An issue with incoming material during the Incoming Quality Control (IQC) process when materials are sampled as they arrive at the loading dock

After a potential non-conformance is identified, evaluated, and documented, the information is sent to the Material Review Board (MRB). MRB members verify the non-conformance, assess the situation, and make a disposition decision to determine what needs to happen to repair, correct, or contain the problem. After a disposition decision is made, the MRB may determine that one or more action plans need to be authored and executed to resolve the non-conformance. A root cause analysis may also be performed.

After executing one or more action plans and validating that all tasks were completed, effectiveness checks may be performed. If the non-conformance passes the effectiveness checks and the problem is resolved, you can close the non-conformance. If you don’t use effectiveness checks, you can close the non-conformance when the action plans are approved and closed.

Some non-conformance workflows require one or more approval levels to ensure that a corrective action or preventive action has been done correctly. Approvals also help ensure that the action plan as authored is suitable to prevent a non-conformance from ever occurring again. There may be multiple people in an organization who need to approve the work done to resolve a non-conformance. The quality manager or an engineer might also need to approve an action plan to prevent or correct a non-conformance from ever occurring again. The goal is to prevent an identified non-conformance from ever occurring again while saving time and money. AQM includes a full range of approval flow options to help you.



  • No labels