Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

An engineering change notice is used to change in-progress products and processes. Change notices are an easy way to make shop floor operators aware of temporary changes in a production flow. With change notices in FactoryLogix, you can react quickly to temporary changes such as a shortage of one material that requires substituting a different material. 

Engineering Change Notices (ECN)

Sometimes things don't go as planned and changes must be broadcast to the factory floor for an already-released product. This course details the steps necessary to initiate an Engineering Change Notice to communicate these types of modifications in real time. Operators on the factory floor can be required to acknowledge these change notices to ensure compliance. 

Aura button
elevationelevated
outlinedregular
borderRadius4
color#FFFFFF
sizemedium
background#0049b0
iconPositionleft
hrefTarget_blank
hrefTypelink
hrefhttps://learn-factorylogix.talentlms.com/unit/view/id:3225
labelGo to course
alignmentleft

Related documentation