FactoryLogix Learning

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

Introduction

Production Planning button

The Production Planning environment in FactoryLogix NPI makes use of a reservation system to “lock” specific material instances (UIDs) to specific batches. These reservations ensure that the materials required to build something are on hand when production begins on the factory floor. By default, required materials are reserved using First In First Out (FIFO) rules so that the oldest materials are consumed first.



  • No labels